{"id":1574,"date":"2021-10-04T14:45:34","date_gmt":"2021-10-04T14:45:34","guid":{"rendered":"https:\/\/eprotraffic.ch\/en\/?p=1574"},"modified":"2022-08-17T14:46:33","modified_gmt":"2022-08-17T14:46:33","slug":"bls-rosshaeuserntunnel","status":"publish","type":"post","link":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/","title":{"rendered":"BLS Rossh\u00e4usern Tunnel"},"content":{"rendered":"\n<p>Railway tunnel Technical facilities \/ equipment<\/p>\n\n\n<div id=\"slider-block_5fb281ac9ff04\" class=\"slider\">\n    <div class=\"image-slider\">\n    \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_1-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_2-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_3-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_7-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_4-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_5-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_6-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_9-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            <\/div>    <\/div>\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Project description<\/strong><br>The 2.1km long Rossh\u00e4usern tunnel is the centrepiece of the new Ross\u00e4usern-Mauss line and part of the double-track expansion of the Bern-Neuch\u00e2tel railway line.<\/p>\n\n\n\n<p>In addition to the actual tunnel, there are technical buildings at both portals, which house the railway technology. In the middle of the tunnel, there is an emergency exit: a shaft about 45m deep with an elevator and stairs, which serves for self-rescue and evacuation of passengers in the event of an incident. EPRO TRAFFIC accompanied this extensive project already in the procurement phase by drawing up the specifications for the &#8220;Low Voltage&#8221; and &#8220;Data Networks&#8221; lots.<\/p>\n\n\n\n<p>During the evaluation of offers from various railway technology providers, EPRO TRAFFIC graded specialist technical aspects. The mandate was extended by BLS. EPRO TRAFFIC was commissioned with specialist controlling and owner representation for the further phases planning, implementation, and commissioning. In addition, EPRO TRAFFIC coordinates the overall integration of the tunnel with BLS\u2019s specialist services, especially with regards to data networks and control systems \/ alarm management.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Our services<\/strong><br>Development \/ preparation of specifications for the low voltage \/ data network lots tender, specialist technical evaluation of railway technology offers, specialist controlling of implementation planning, participation in caveat processing with the Federal Office of Transport, specialist controlling and owner representation for the low voltage and telecommunications lots during implementation and commissioning, participation in internal processes at BLS such as operational preparation and incident processes, coordination of overall integration of low voltage and telecommunications, construction meetings and specialist controlling on site<\/p>\n\n\n\n<p><strong>Plants \/ Systems LP4<\/strong><br>50Hz\/16.7Hz primary supply and 980 V tunnel supply, power distributions, transformers, dual frequency uninterruptible power supply systems, illuminated handrail with LED orientation lighting, return and grounding according to D RTE 2790, technical alarm management, automation and control of incident ventilation and tunnel gate, local area network<\/p>\n\n\n\n<p><strong>Plants \/ Systems LP5<\/strong><br>Data networks fiber optic and telecommunication copper cables, radio (GSM-R, fire-fighting and rescue trains, Polycom), emergency call points<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Owner \/ Reference\u00a0<\/strong><br>BLS Netz AG<br>Installations &amp; Projects, IPHG<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Client \/ Reference<\/strong><br>BLS Netz AG<br>Rolf Fankhauser, IPHG<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Project location \/ route<\/strong><br>Rossh\u00e4usern \u2013 Mauss line<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-light-gray-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Planning services, project information<\/h2>\n\n\n\n<div class=\"wp-block-columns planungsleistungen is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Field<\/strong><br>Rail<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Type<\/strong><br>Tunnel<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>SIA Phases<\/strong><br>Tender \u2013 Commissioning<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Planning period<\/strong><br>2013 \u2013 2018<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<p><strong>Departments<\/strong><br>Technical installtions and Equipment<br>Mandate<\/p>\n\n\n\n<p><br><\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Implementation period<\/strong><br>2013 \u2013 2018<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<p><strong>Under ongoing railway operations<strong>&nbsp;<\/strong><\/strong><br>Partly<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Construction costs<\/strong><br>CHF 12 million (railway technology), <br>CHF 2 million (electrical engineering)<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<p><strong>Facts \/ Key figures<\/strong><br>2.1 km long tunnel<br>980V tunnel supply network<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-light-gray-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Do you have any questions about this project?<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p><strong>We are happy to answer them<\/strong> \u2013 we want to inspire you with our planning services.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<h4 class=\"wp-block-heading\">Contact Us<\/h4>\n\n\n\n<p>Alexander von R\u00fctte<br>Phone <a href=\"tel:+41 58 502 73 04\">+41 58 502 73 70<\/a><br><a href=\"mailto:alexander.vonruette@epro.ch\">Contact by e-mail<\/a><\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The 2.1km long Rossh\u00e4usern tunnel is the centrepiece of the new Ross\u00e4usern-Mauss line and part of the double-track expansion of the Bern-Neuch\u00e2tel railway line.In addition to the actual tunnel, there are technical buildings at both portals, which house the railway technology.<\/p>\n","protected":false},"author":2,"featured_media":1584,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[17],"tags":[],"class_list":["post-1574","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail","project_service-mandates","project_service-technical-installations-and-equipment","project_region-espace-mittelland"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>BLS Rossh\u00e4usern Tunnel - EPRO TRAFFIC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BLS Rossh\u00e4usern Tunnel - EPRO TRAFFIC\" \/>\n<meta property=\"og:description\" content=\"The 2.1km long Rossh\u00e4usern tunnel is the centrepiece of the new Ross\u00e4usern-Mauss line and part of the double-track expansion of the Bern-Neuch\u00e2tel railway line.In addition to the actual tunnel, there are technical buildings at both portals, which house the railway technology.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/\" \/>\n<meta property=\"og:site_name\" content=\"EPRO TRAFFIC\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-04T14:45:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-17T14:46:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"epro\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"epro\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/\"},\"author\":{\"name\":\"epro\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f\"},\"headline\":\"BLS Rossh\u00e4usern Tunnel\",\"datePublished\":\"2021-10-04T14:45:34+00:00\",\"dateModified\":\"2022-08-17T14:46:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/\"},\"wordCount\":433,\"publisher\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg\",\"articleSection\":[\"Rail\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/\",\"url\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/\",\"name\":\"BLS Rossh\u00e4usern Tunnel - EPRO TRAFFIC\",\"isPartOf\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg\",\"datePublished\":\"2021-10-04T14:45:34+00:00\",\"dateModified\":\"2022-08-17T14:46:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage\",\"url\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg\",\"contentUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg\",\"width\":1500,\"height\":1000},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/eprotraffic.ch\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BLS Rossh\u00e4usern Tunnel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#website\",\"url\":\"https:\/\/eprotraffic.ch\/en\/\",\"name\":\"EPRO TRAFFIC\",\"description\":\"Wegweisende L\u00f6sungen f\u00fcr die Verkehrsinfrastruktur\",\"publisher\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eprotraffic.ch\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#organization\",\"name\":\"EPRO TRAFFIC\",\"url\":\"https:\/\/eprotraffic.ch\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg\",\"contentUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg\",\"width\":100,\"height\":100,\"caption\":\"EPRO TRAFFIC\"},\"image\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f\",\"name\":\"epro\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g\",\"caption\":\"epro\"},\"url\":\"https:\/\/eprotraffic.ch\/en\/author\/epro\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BLS Rossh\u00e4usern Tunnel - EPRO TRAFFIC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/","og_locale":"en_US","og_type":"article","og_title":"BLS Rossh\u00e4usern Tunnel - EPRO TRAFFIC","og_description":"The 2.1km long Rossh\u00e4usern tunnel is the centrepiece of the new Ross\u00e4usern-Mauss line and part of the double-track expansion of the Bern-Neuch\u00e2tel railway line.In addition to the actual tunnel, there are technical buildings at both portals, which house the railway technology.","og_url":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/","og_site_name":"EPRO TRAFFIC","article_published_time":"2021-10-04T14:45:34+00:00","article_modified_time":"2022-08-17T14:46:33+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg","type":"image\/jpeg"}],"author":"epro","twitter_card":"summary_large_image","twitter_misc":{"Written by":"epro","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#article","isPartOf":{"@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/"},"author":{"name":"epro","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f"},"headline":"BLS Rossh\u00e4usern Tunnel","datePublished":"2021-10-04T14:45:34+00:00","dateModified":"2022-08-17T14:46:33+00:00","mainEntityOfPage":{"@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/"},"wordCount":433,"publisher":{"@id":"https:\/\/eprotraffic.ch\/en\/#organization"},"image":{"@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg","articleSection":["Rail"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/","url":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/","name":"BLS Rossh\u00e4usern Tunnel - EPRO TRAFFIC","isPartOf":{"@id":"https:\/\/eprotraffic.ch\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage"},"image":{"@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg","datePublished":"2021-10-04T14:45:34+00:00","dateModified":"2022-08-17T14:46:33+00:00","breadcrumb":{"@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#primaryimage","url":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg","contentUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/10\/EPROtraffic_projekt_BLS-Rosshaeuserntunnel_8.jpg","width":1500,"height":1000},{"@type":"BreadcrumbList","@id":"https:\/\/eprotraffic.ch\/en\/bls-rosshaeuserntunnel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eprotraffic.ch\/en\/"},{"@type":"ListItem","position":2,"name":"BLS Rossh\u00e4usern Tunnel"}]},{"@type":"WebSite","@id":"https:\/\/eprotraffic.ch\/en\/#website","url":"https:\/\/eprotraffic.ch\/en\/","name":"EPRO TRAFFIC","description":"Wegweisende L\u00f6sungen f\u00fcr die Verkehrsinfrastruktur","publisher":{"@id":"https:\/\/eprotraffic.ch\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eprotraffic.ch\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eprotraffic.ch\/en\/#organization","name":"EPRO TRAFFIC","url":"https:\/\/eprotraffic.ch\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/","url":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg","contentUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg","width":100,"height":100,"caption":"EPRO TRAFFIC"},"image":{"@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f","name":"epro","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g","caption":"epro"},"url":"https:\/\/eprotraffic.ch\/en\/author\/epro\/"}]}},"_links":{"self":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts\/1574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/comments?post=1574"}],"version-history":[{"count":30,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts\/1574\/revisions"}],"predecessor-version":[{"id":1870,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts\/1574\/revisions\/1870"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/media\/1584"}],"wp:attachment":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/media?parent=1574"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/categories?post=1574"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/tags?post=1574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}