{"id":1457,"date":"2021-10-08T08:54:06","date_gmt":"2021-10-08T08:54:06","guid":{"rendered":"https:\/\/eprotraffic.ch\/en\/?p=1457"},"modified":"2022-08-17T14:40:49","modified_gmt":"2022-08-17T14:40:49","slug":"rbs-station-ittigen","status":"publish","type":"post","link":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/","title":{"rendered":"RBS Ittigen Station"},"content":{"rendered":"\n<p>Railway station and public facilities<\/p>\n\n\n<div id=\"slider-block_5fb281ac9ff04\" class=\"slider\">\n    <div class=\"image-slider\">\n    \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"702\" height=\"367\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPRO-TRAFFIC_Projekt_RBS_Bahnhof_Ittigen_Plan.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPRO-TRAFFIC_Projekt_RBS_Bahnhof_Ittigen_Plan.jpg 702w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPRO-TRAFFIC_Projekt_RBS_Bahnhof_Ittigen_Plan-300x157.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPRO-TRAFFIC_Projekt_RBS_Bahnhof_Ittigen_Plan-356x186.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPRO-TRAFFIC_Projekt_RBS_Bahnhof_Ittigen_Plan-594x311.jpg 594w\" sizes=\"(max-width: 702px) 100vw, 702px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p>Prinzipschema Perronanlage<\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_1-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_2-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_3-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_4-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_5-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_7-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            \n            <div class=\"slide\">\n                <div class=\"image-wrapper\">\n                    <div class=\"image\">\n                        <img decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8.jpg\" class=\"attachment-slider-block-2x size-slider-block-2x\" alt=\"\" srcset=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8.jpg 1500w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-300x200.jpg 300w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-1024x683.jpg 1024w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-356x237.jpg 356w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-768x512.jpg 768w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-357x238.jpg 357w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-351x234.jpg 351w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-594x396.jpg 594w, https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_8-1188x792.jpg 1188w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                    <\/div>\n                <\/div>\n                <div class=\"description\">\n                    <p><\/p>\n                <\/div>\n            <\/div>\n\n            <\/div>    <\/div>\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Project description<\/strong><br>As part of the overall project Nodal Station Ittigen &#8220;upwardly compatible&#8221;, the S-Bahn station Ittigen is being modernised and brought into accordance with the&nbsp;Disability Discrimination Act. The project consists of several components such as the platform roof, platforms and a new passenger underpass. EPRO TRAFFIC was commissioned by the two owners RBS and the municipality of Ittigen with the railway-specific electrical planning in the low-voltage and telecommunications departments.<\/p>\n\n\n\n<p><strong>Complexity<\/strong><br>The already modernized platform 2 will be adapted to the new structures such as accesses, etc. Furthermore, a new technical room containing the necessary facilities and systems for the station\u2019s operation will be built on platform 2. This leads to various changes to the existing installations and systems. The project requires a detailed and well thought-out construction-phase planning, also with regard to the low-voltage and telecommunications systems, which are partly built in parallel to the existing ones and switched over under ongoing railway operation.<\/p>\n\n\n\n<p><strong>Implementation<\/strong><br>The existing platform 1 will be completely dismantled and rebuilt. A special feature is the new platform roof that sets an accent with curved LED lighting. In all other covered or uncovered platform areas, in addition to the lighting, the platform equipment such as loudspeakers, departure indicators, ticket machines, etc. will be renewed and connected to the new technical room. A completely new passenger underpass serves the municipality as well as the passengers of the RBS. The focus is on social security and thus also on the requirements for modern lighting that harmonises with the environment.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Our services<\/strong><br>Complete planning and construction management from SIA phase 32 to and including 53 (development of the preliminary-project phase 31 in phase 32). Preparing the dossier on electrical + telecom installations incl. lighting concept for the planning approval procedure. Creating all planning bases such as installation plans, principle diagrams, electrical diagrams, etc. Elaborating the lighting concept including simulations and calculations according to legal specifications such as avoiding glare for train drivers. Interface coordination with the owner\u2019s specialist services and third-party planners, e.g. with regard to work lines or building grounding. Participation in construction phase planning. Planning based on railway-specific regulations, e.g. regarding return and grounding.<\/p>\n\n\n\n<p><strong>Conclusion<\/strong><br>Right from the start, the project proves that cooperation with people should be in the foreground during planning. This is also what we particularly like about this project. With our many years of experience in the field of railway infrastructure, we can accompany our clients and partners in this complex project.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Owner \/ Reference<\/strong><br>Builders&#8217; Association Nodal Station Ittigen<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Client \/ Reference<\/strong><br>Regional Transport Bern-Solothurn RBS<br>Gemeinde Ittigen<br>Thomas Luginb\u00fchl, RBS EA<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Project location \/ Route<\/strong><br>Ittigen near Bern<br>RBS line W<br>Worb \u2013 Worblaufen<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-light-gray-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Planning services, project information<\/h2>\n\n\n\n<div class=\"wp-block-columns planungsleistungen is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Field<\/strong><br>Rail<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Type<\/strong><br>Railway station<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>SIA Phases<\/strong><br>Construction Project \u2013 Commissioning<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Planning period<\/strong><br>2019 \u2013 2023<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<p><strong>Departments<\/strong><br>Technical equipment<br>Public facilities<br>Low voltage + telecom<\/p>\n\n\n\n<p><br><\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Implementation period<\/strong><br>2019 \u2013 2023<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<p><strong>Under ongoing railway operations&nbsp;<\/strong><br>Yes<br><\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Total costs<\/strong><br>CHF 10,7 million<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-light-gray-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Do you have any questions about this project?<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p><strong>We are happy to answer them<\/strong> \u2013 we want to inspire you with our planning services.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<h4 class=\"wp-block-heading\">Contact Us<\/h4>\n\n\n\n<p>Alexander von R\u00fctte<br>Phone <a href=\"tel:+41 58 502 73 04\">+41 58 502 73 70<\/a><br><a href=\"mailto:alexander.vonruette@epro.ch\">Contact by e-mail<\/a><\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>As part of the overall project Nodal Station Ittigen &#8220;upwardly compatible&#8221;, the S-Bahn station Ittigen is being modernised and brought into accordance with the\u00a0Disability Discrimination Act. The project consists of several components such as the platform roof, platforms and a new passenger underpass.<\/p>\n","protected":false},"author":2,"featured_media":1513,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[17],"tags":[],"class_list":["post-1457","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail","project_service-public-facilities","project_service-technical-installations-and-equipment","project_region-espace-mittelland"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>RBS Ittigen Station - EPRO TRAFFIC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RBS Ittigen Station - EPRO TRAFFIC\" \/>\n<meta property=\"og:description\" content=\"As part of the overall project Nodal Station Ittigen &quot;upwardly compatible&quot;, the S-Bahn station Ittigen is being modernised and brought into accordance with the\u00a0Disability Discrimination Act. The project consists of several components such as the platform roof, platforms and a new passenger underpass.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/\" \/>\n<meta property=\"og:site_name\" content=\"EPRO TRAFFIC\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-08T08:54:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-17T14:40:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"epro\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"epro\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/\"},\"author\":{\"name\":\"epro\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f\"},\"headline\":\"RBS Ittigen Station\",\"datePublished\":\"2021-10-08T08:54:06+00:00\",\"dateModified\":\"2022-08-17T14:40:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/\"},\"wordCount\":509,\"publisher\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg\",\"articleSection\":[\"Rail\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/\",\"url\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/\",\"name\":\"RBS Ittigen Station - EPRO TRAFFIC\",\"isPartOf\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg\",\"datePublished\":\"2021-10-08T08:54:06+00:00\",\"dateModified\":\"2022-08-17T14:40:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage\",\"url\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg\",\"contentUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg\",\"width\":1500,\"height\":1000},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/eprotraffic.ch\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"RBS Ittigen Station\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#website\",\"url\":\"https:\/\/eprotraffic.ch\/en\/\",\"name\":\"EPRO TRAFFIC\",\"description\":\"Wegweisende L\u00f6sungen f\u00fcr die Verkehrsinfrastruktur\",\"publisher\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eprotraffic.ch\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#organization\",\"name\":\"EPRO TRAFFIC\",\"url\":\"https:\/\/eprotraffic.ch\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg\",\"contentUrl\":\"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg\",\"width\":100,\"height\":100,\"caption\":\"EPRO TRAFFIC\"},\"image\":{\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f\",\"name\":\"epro\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g\",\"caption\":\"epro\"},\"url\":\"https:\/\/eprotraffic.ch\/en\/author\/epro\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"RBS Ittigen Station - EPRO TRAFFIC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/","og_locale":"en_US","og_type":"article","og_title":"RBS Ittigen Station - EPRO TRAFFIC","og_description":"As part of the overall project Nodal Station Ittigen \"upwardly compatible\", the S-Bahn station Ittigen is being modernised and brought into accordance with the\u00a0Disability Discrimination Act. The project consists of several components such as the platform roof, platforms and a new passenger underpass.","og_url":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/","og_site_name":"EPRO TRAFFIC","article_published_time":"2021-10-08T08:54:06+00:00","article_modified_time":"2022-08-17T14:40:49+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg","type":"image\/jpeg"}],"author":"epro","twitter_card":"summary_large_image","twitter_misc":{"Written by":"epro","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#article","isPartOf":{"@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/"},"author":{"name":"epro","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f"},"headline":"RBS Ittigen Station","datePublished":"2021-10-08T08:54:06+00:00","dateModified":"2022-08-17T14:40:49+00:00","mainEntityOfPage":{"@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/"},"wordCount":509,"publisher":{"@id":"https:\/\/eprotraffic.ch\/en\/#organization"},"image":{"@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage"},"thumbnailUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg","articleSection":["Rail"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/","url":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/","name":"RBS Ittigen Station - EPRO TRAFFIC","isPartOf":{"@id":"https:\/\/eprotraffic.ch\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage"},"image":{"@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage"},"thumbnailUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg","datePublished":"2021-10-08T08:54:06+00:00","dateModified":"2022-08-17T14:40:49+00:00","breadcrumb":{"@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#primaryimage","url":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg","contentUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/08\/EPROtraffic_projekt_RBS-Ittigen_6.jpg","width":1500,"height":1000},{"@type":"BreadcrumbList","@id":"https:\/\/eprotraffic.ch\/en\/rbs-station-ittigen\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eprotraffic.ch\/en\/"},{"@type":"ListItem","position":2,"name":"RBS Ittigen Station"}]},{"@type":"WebSite","@id":"https:\/\/eprotraffic.ch\/en\/#website","url":"https:\/\/eprotraffic.ch\/en\/","name":"EPRO TRAFFIC","description":"Wegweisende L\u00f6sungen f\u00fcr die Verkehrsinfrastruktur","publisher":{"@id":"https:\/\/eprotraffic.ch\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eprotraffic.ch\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eprotraffic.ch\/en\/#organization","name":"EPRO TRAFFIC","url":"https:\/\/eprotraffic.ch\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/","url":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg","contentUrl":"https:\/\/eprotraffic.ch\/en\/wp-content\/uploads\/sites\/2\/2021\/05\/Logo_EPROtraffic_RGB-1.svg","width":100,"height":100,"caption":"EPRO TRAFFIC"},"image":{"@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/e9ca08d66f2c4dcb2e1a44f2dac4c82f","name":"epro","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eprotraffic.ch\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3550491f4bf82648c823eb114c3290a73e4bc1088ee49c43eb0afe9b53c83490?s=96&d=mm&r=g","caption":"epro"},"url":"https:\/\/eprotraffic.ch\/en\/author\/epro\/"}]}},"_links":{"self":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts\/1457","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/comments?post=1457"}],"version-history":[{"count":20,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts\/1457\/revisions"}],"predecessor-version":[{"id":1862,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/posts\/1457\/revisions\/1862"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/media\/1513"}],"wp:attachment":[{"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/media?parent=1457"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/categories?post=1457"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eprotraffic.ch\/en\/wp-json\/wp\/v2\/tags?post=1457"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}